NEES@Lehigh
  • Home
  • Facility
    • ATLSS Facility
    • Personnel
    • IT Security
  • Safety
  • Projects
    • Self-Centering Steel Frame Systems
      • Energy Dissipation Elements
      • Moment Resisting Frame
      • Concentrically-Braced Frame
    • Advanced Damping Systems
    • Elastomeric Structural Damper
      • PBD for Seismic Hazard Mitigation
      • Experimental Investigation
      • Performance-Based Design
    • Real-time Hybrid Testing
    • Diaphragm Seismic Design Methodology
    • MISST
    • Buckling-Restrained Braced Frame
      • Buckling-Restrained Braced Frame Videos
    • MRF System with CFT Columns
  • Resources
    • User’s Guide
    • Live Video
    • Calendar
    • Supported Software
    • RDV
    • Publications
      • 2010
      • 2009
      • 2008
      • 2007
      • 2006
      • 2005
      • 2004
      • 2003
      • 2002
    • Lehigh Data Model
    • Workshops
  • Multimedia
    • Photos
      • William Allen High School Trip
      • Elastomeric Damper Installation
      • MISST Construction
      • SC-CBF Base Detail Study
      • BRBF Construction
      • BRBF Testing
      • BRBF Results
      • Composite MRF System with CFT Column Setup
      • Composite MRF System with CFT Column Results
    • Videos
  • News
  • Contact
  • Links
You are here: Home / Archives for

NEESR-SG: Self-Centering Damage-Free Seismic-Resistant Steel Frame Systems SC-MRF Hybrid Simulation for High-Level MCE

November 6, 2008  
Filed under Project Spotlight

The RTMD facility will be performing a high level MCE hybrid simulation on November 7th, 2008, beginning at 11am, EDT.

[Read More]

NEESR-SG: Self-Centering Damage-Free Seismic-Resistant Steel Frame Systems SC-MRF Hybrid Simulation for Aftershock

October 31, 2008  
Filed under Project Spotlight

The RTMD facility will be performing an Aftershock hybrid simulation on October 31, 2008, beginning at 11am, EDT.

[Read More]

NEESR-SG: Self-Centering Damage-Free Seismic-Resistant Steel Frame Systems SC-MRF Median MCE Hybrid Simulation

October 28, 2008  
Filed under Project Spotlight

The RTMD facility will be performing a median level MCE hybrid simulation on October 29, 2008, beginning at 11am, EDT.

[Read More]

NEESR-SG: Self-Centering Damage-Free Seismic-Resistant Steel Frame Systems SC-MRF High-Level DBE/Median MCE Hybrid Simulation

October 21, 2008  
Filed under Project Spotlight

The RTMD facility will be performing a high level DBE/median level MCE hybrid simulation on October 23, 2008, beginning at 11am, EDT.

[Read More]

NEESR-SG: Self-Centering Damage-Free Seismic-Resistant Steel Frame Systems SC-MRF High-Level DBE Hybrid Simulation

October 17, 2008  
Filed under Project Spotlight

The RTMD facility will be performing a hybrid simulation on October 21, 2008, beginning at 11am, EDT.

[Read More]

ATLSS involved in Discovery Channel program

September 25, 2008  
Filed under News and Events

The ATLSS center was involved in the filming of the new show Collapse! which premiered on the Discovery Channel on Thursday, September 25th at 10pm.

[Read More]

“The Works” highlights ATLSS

August 25, 2008  
Filed under News and Events

History Channel, as part of their series, “The Works“, does a show dedicated to steel and interviews Dr. Richard Sause on various steel projects at ATLSS.

[Read More]

RTMD hosts Launch-IT

July 23, 2008  
Filed under News and Events

The RTMD facility and staff hosted a 2 day EOT event where students from the Launch-IT program at Lehigh University spent their afternoon learning about and experiencing the technology and research going on at the facility.

[Read More]

ATLSS Seminar: Overview of Structures for 2008 Olympic Games

May 28, 2008  
Filed under News and Events

Dr. Qingshan Yang will be conducting a seminar on Monday, June 2nd at 10:30am at Lehigh University’s ATLSS center.

[Read More]

2008 NEES REU program begins

May 27, 2008  
Filed under News and Events

Lehigh University and the RTMD facility are hosting three NEES REU students this summer for ten weeks. Projects include self-centering braced frame and damper studies.

[Read More]

  • Categories

    • News and Events (41)
    • Project Spotlight (7)
  • Recent News

    • Researchers probe how strong buildings must be to survive tsunamis
    • Advances in Real Time Hybrid Simulation Workshop
    • Upcoming workshop
  • Archives

    • ► 2012
      • Researchers probe how strong buildings must be to … (03/20)
    • ► 2011
      • Advances in Real Time Hybrid Simulation Workshop (08/26)
      • Upcoming workshop (08/16)
      • Seismic Hazard Mitigation using Passive Damper Sys … (03/21)
      • Distributed RT Hybrid Testing (03/17)
      • Pictures from William Allen HS Field Trip (03/08)
      • Student Field Trip this Friday (02/22)
      • Testing on passive damping systems (02/18)
      • NEES equipment maintenance (01/17)
      • "Megaquake 10.0" History Channel Special … (01/11)
    • ► 2010
      • MR Damper Projects (12/28)
      • SteelDay 2010 (09/24)
      • ATLSS Welcomes the 2010 NEES REU Students (06/01)
    • ► 2009
      • Three ATLSS Center researchers honored by American … (07/08)
      • ATLSS welcomes the 2009 REU Students (05/27)
      • Lehigh Webinar for RTMD users (02/18)
    • ► 2008
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (11/06)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/31)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/28)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/21)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/17)
      • ATLSS involved in Discovery Channel program (09/25)
      • "The Works" highlights ATLSS (08/25)
      • RTMD hosts Launch-IT (07/23)
      • ATLSS Seminar: Overview of Structures for 2008 Oly … (05/28)
      • 2008 NEES REU program begins (05/27)
      • Germantown High students get all shook up on field … (05/14)
      • 3D Model Panel for RDV Update (03/19)
    • ► 2007
      • RTMD Highlights for November, 2007 (11/01)
      • RTMD Highlights for October, 2007 (10/01)
      • RTMD Highlights for September, 2007 (09/01)
      • RTMD Highlights for June, 2007 (06/01)
      • RTMD Highlights for May, 2007 (05/01)
      • RTMD Highlights for February, 2007 (02/01)
    • ► 2006
      • RTMD Highlights for November, 2006 (11/01)
      • RTMD Highlights for July, 2006 (07/01)
      • RTMD Highlights for June, 2006 (06/01)
      • RTMD Highlights for May, 2006 (05/01)
      • RTMD Highlights for April, 2006 (04/01)
      • RTMD Highlights for March, 2006 (03/01)
      • RTMD Highlights for February, 2006 (02/01)
      • RTMD Highlights for January, 2006 (01/01)
    • ► 2005
      • RTMD Highlights for December, 2005 (12/01)
      • RTMD Highlights for November, 2005 (11/01)
      • Hybrid Testing Workshop in San Diego (10/01)
      • E-Defense Workshop (08/01)
      • Self Centering Workshop (06/01)
    • ► 2004
      • NEES@Lehigh begins (10/01)
  •    May  2012 »
    SMTWTFS
     12345
    6789101112
    13141516
    May 16, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    17
    May 17, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    18
    May 18, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    19
    May 19, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    20
    May 20, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    21
    May 21, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    22
    May 22, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    23
    May 23, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    24
    May 24, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    25
    May 25, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    26
    May 26, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    27
    May 27, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    28
    May 28, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    29
    May 29, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    30
    May 30, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    31
    May 31, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

     
  • Equipment Calendar

    [site map] Copyright © 2011 · All Rights Reserved · Lehigh University
    This site is supported by the George E. Brown, Jr. Network for Earthquake Engineering Simulation (NEES) Program of the National Science Foundation under Award Number CMMI-0927178