NEES@Lehigh
  • Home
  • Facility
    • ATLSS Facility
    • Personnel
    • IT Security
  • Safety
  • Projects
    • Self-Centering Steel Frame Systems
      • Energy Dissipation Elements
      • Moment Resisting Frame
      • Concentrically-Braced Frame
    • Advanced Damping Systems
    • Elastomeric Structural Damper
      • PBD for Seismic Hazard Mitigation
      • Experimental Investigation
      • Performance-Based Design
    • Real-time Hybrid Testing
    • Diaphragm Seismic Design Methodology
    • MISST
    • Buckling-Restrained Braced Frame
      • Buckling-Restrained Braced Frame Videos
    • MRF System with CFT Columns
  • Resources
    • User’s Guide
    • Live Video
    • Calendar
    • Supported Software
    • RDV
    • Publications
      • 2010
      • 2009
      • 2008
      • 2007
      • 2006
      • 2005
      • 2004
      • 2003
      • 2002
    • Lehigh Data Model
    • Workshops
  • Multimedia
    • Photos
      • William Allen High School Trip
      • Elastomeric Damper Installation
      • MISST Construction
      • SC-CBF Base Detail Study
      • BRBF Construction
      • BRBF Testing
      • BRBF Results
      • Composite MRF System with CFT Column Setup
      • Composite MRF System with CFT Column Results
    • Videos
  • News
  • Contact
  • Links
You are here: Home / News and Events / Germantown High students get all shook up on field trip

Germantown High students get all shook up on field trip

May 14, 2008  

Leave a Comment

One day after a devastating 7.9-magnitude earthquake shook China, killing at least 12,000, a group of Germantown High School students visited Lehigh University to learn how engineers build bridges and other structures to withstand the shocks of tremors.

The 31 10th-graders visited the Real Time Multi-Directional Testing Facility at the ATLSS engineering research center and laboratory at Lehigh.

They were accompanied by their geometry teacher, Randy Conley, and by Jessa Ellenburg, an engineer with the Philadelphia firm Urban Engineers Inc., which donated $700 for the trip.

At the university, laboratory director Gary Novak pulled up the United States Geological Survey Web site in a PowerPoint presentation “that brought up a map of the entire world,” Ellenburg said yesterday.

“When he asked them, ‘What do you think this square is?’ they all knew, they said, ‘China,’ ” Ellenburg said. Lehigh’s research and testing center is part of a national, shared-use research facility for the earthquake-engineering community.

It’s known as the Network for Earthquake Engineering Simulation – or NEES – program of the National Science Foundation. The site is at www.nees.org.

When the students returned to Germantown High School at about 3:30 yesterday afternoon, they were still revved-up about what they had seen.

“It was great,” said Shaneil Dunn, 16. “I learned a lot about earthquakes, and how engineers have to build bridges and buildings to make them safe.

“Now geometry class makes sense,” she said.

Timothy Carter, 17, said he was glad “to learn about things I didn’t know before.”

He said he wants to improve his geometry grades so that he can possibly work as an engineer someday.

Both students said that they had no real interest in geometry before Ellenburg visited their geometry class last fall to talk about her work designing bridges.

“I talked about what math does in the real world, how earthquake research applies to bridges and how important it is to get good grades in math so they will be able to study this in college,” she said.

Ellenburg’s current assignment with Urban Engineers is to design one of the bridges as part of the project to widen the Northeast Extension of the Pennsylvania Turnpike.

She called yesterday’s trip to Lehigh University “extraordinary.”

“It was wonderful,” Ellenburg said. “They loved this stuff and they eat it up. Also, it’s a plug for college and graduating from high school.”

Leave a Reply

Click here to cancel reply.

  • Categories

    • News and Events (41)
    • Project Spotlight (7)
  • Recent News

    • Researchers probe how strong buildings must be to survive tsunamis
    • Advances in Real Time Hybrid Simulation Workshop
    • Upcoming workshop
  • Archives

    • ► 2012
      • Researchers probe how strong buildings must be to … (03/20)
    • ► 2011
      • Advances in Real Time Hybrid Simulation Workshop (08/26)
      • Upcoming workshop (08/16)
      • Seismic Hazard Mitigation using Passive Damper Sys … (03/21)
      • Distributed RT Hybrid Testing (03/17)
      • Pictures from William Allen HS Field Trip (03/08)
      • Student Field Trip this Friday (02/22)
      • Testing on passive damping systems (02/18)
      • NEES equipment maintenance (01/17)
      • "Megaquake 10.0" History Channel Special … (01/11)
    • ► 2010
      • MR Damper Projects (12/28)
      • SteelDay 2010 (09/24)
      • ATLSS Welcomes the 2010 NEES REU Students (06/01)
    • ► 2009
      • Three ATLSS Center researchers honored by American … (07/08)
      • ATLSS welcomes the 2009 REU Students (05/27)
      • Lehigh Webinar for RTMD users (02/18)
    • ► 2008
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (11/06)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/31)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/28)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/21)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/17)
      • ATLSS involved in Discovery Channel program (09/25)
      • "The Works" highlights ATLSS (08/25)
      • RTMD hosts Launch-IT (07/23)
      • ATLSS Seminar: Overview of Structures for 2008 Oly … (05/28)
      • 2008 NEES REU program begins (05/27)
      • Germantown High students get all shook up on field … (05/14)
      • 3D Model Panel for RDV Update (03/19)
    • ► 2007
      • RTMD Highlights for November, 2007 (11/01)
      • RTMD Highlights for October, 2007 (10/01)
      • RTMD Highlights for September, 2007 (09/01)
      • RTMD Highlights for June, 2007 (06/01)
      • RTMD Highlights for May, 2007 (05/01)
      • RTMD Highlights for February, 2007 (02/01)
    • ► 2006
      • RTMD Highlights for November, 2006 (11/01)
      • RTMD Highlights for July, 2006 (07/01)
      • RTMD Highlights for June, 2006 (06/01)
      • RTMD Highlights for May, 2006 (05/01)
      • RTMD Highlights for April, 2006 (04/01)
      • RTMD Highlights for March, 2006 (03/01)
      • RTMD Highlights for February, 2006 (02/01)
      • RTMD Highlights for January, 2006 (01/01)
    • ► 2005
      • RTMD Highlights for December, 2005 (12/01)
      • RTMD Highlights for November, 2005 (11/01)
      • Hybrid Testing Workshop in San Diego (10/01)
      • E-Defense Workshop (08/01)
      • Self Centering Workshop (06/01)
    • ► 2004
      • NEES@Lehigh begins (10/01)
  •    May  2012 »
    SMTWTFS
     12345
    6789101112
    13141516
    May 16, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    17
    May 17, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    18
    May 18, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    19
    May 19, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    20
    May 20, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    21
    May 21, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    22
    May 22, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    23
    May 23, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    24
    May 24, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    25
    May 25, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    26
    May 26, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    27
    May 27, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    28
    May 28, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    29
    May 29, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    30
    May 30, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    31
    May 31, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

     
  • Equipment Calendar

    [site map] Copyright © 2011 · All Rights Reserved · Lehigh University
    This site is supported by the George E. Brown, Jr. Network for Earthquake Engineering Simulation (NEES) Program of the National Science Foundation under Award Number CMMI-0927178