NEES@Lehigh
  • Home
  • Facility
    • ATLSS Facility
    • Personnel
  • Safety
  • Projects
    • Self-Centering Steel Frame Systems
      • Energy Dissipation Elements
      • Moment Resisting Frame
      • Concentrically-Braced Frame
    • Advanced Damping Systems
    • Elastomeric Structural Damper
      • PBD for Seismic Hazard Mitigation
      • Experimental Investigation
      • Performance-Based Design
    • Real-time Hybrid Testing
    • Diaphragm Seismic Design Methodology
    • MISST
    • Buckling-Restrained Braced Frame
      • Buckling-Restrained Braced Frame Videos
    • MRF System with CFT Columns
  • Resources
    • User’s Guide
    • Live Video
    • Calendar
    • Supported Software
    • RDV
    • Publications
      • 2010
      • 2009
      • 2008
      • 2007
      • 2006
      • 2005
      • 2004
      • 2003
      • 2002
    • Lehigh Data Model
    • Workshops
  • Multimedia
    • Photos
      • William Allen High School Trip
      • Elastomeric Damper Installation
      • MISST Construction
      • SC-CBF Base Detail Study
      • BRBF Construction
      • BRBF Testing
      • BRBF Results
      • Composite MRF System with CFT Column Setup
      • Composite MRF System with CFT Column Results
    • Videos
  • News
  • Contact
  • Links
You are here: Home / News

Advances in Real Time Hybrid Simulation Workshop

August 26, 2011  
Filed under News and Events

Two-day workshop on Advances in Real-Time Hybrid Simulation workshop to be held October 10-11, 2011.

[Read More]

Upcoming workshop

August 16, 2011  
Filed under News and Events

The RTMD facility is planning a RTHS workshop for mid-October. Look for more details at this website or ATLSS Website very soon.

[Read More]

Distributed RT Hybrid Testing

March 17, 2011  
Filed under News and Events

Lehigh University, University of Connecticut and UIUC will be conducting Real-Time Distributed Hybrid tests using MR Dampers today and tomorrow. More information to follow through this website and NEES.org

[Read More]

Pictures from William Allen HS Field Trip

March 8, 2011  
Filed under News and Events

Pictures from the William Allen High School Field Trip on February 25th, 2011, are posted under the Photos section of the website

[Read More]

Student Field Trip this Friday

February 22, 2011  
Filed under News and Events

Excelling 10th grade students from William Allen High School will be taking a field trip to our RTMD facility Friday morning, February 25th to learn more about how earthquakes affect buildings and how researchers perform experiments to validate damage prevention techniques to protect buildings from seismic activity.  They will take a lab tour, learn lessons [...]

[Read More]

Testing on passive damping systems

February 18, 2011  
Filed under News and Events

The vision for this research is a validated probabilistic, performance-based seismic design procedure for buildings with passive damping systems. Tests at the Lehigh NEES equipment site will characterize the dampers; analytical models for the dampers will be calibrated and validated.

[Read More]

NEES equipment maintenance

January 17, 2011  
Filed under News and Events

MTS will be here from Jan. 24 through Feb. 24 to calibrate the NEES actuators.  HT Lyons will be here from Feb. 7 through Feb. 16 to install relief valves on the accumulators. There will be limited NEES testing during this time.

[Read More]

“Megaquake 10.0″ History Channel Special Features NEES Projects

January 11, 2011  
Filed under News and Events

The History Channel will present Megaquake 10.0 on Wednesday, January 12, at 9 p.m. Eastern Time. The two-hour, non-fiction special explores one of the most deadly and perplexing mysteries that surrounds planet earth: huge megaquakes.

[Read More]

SteelDay 2010

September 24, 2010  
Filed under News and Events

The ATLSS Center hosted their 2nd annual SteelDay event on September 24th, 2010.

[Read More]

ATLSS Welcomes the 2010 NEES REU Students

June 1, 2010  
Filed under News and Events

The ATLSS Center welcomes Matt Alford, Jose Hernandez, Karen Mendez, Shahab Shaolian, Stefanie Tong and Diane Wurst for the 2010 Summer REU program at Lehigh University.

[Read More]

  • Categories

    • News and Events (40)
    • Project Spotlight (7)
  • Recent News

    • Advances in Real Time Hybrid Simulation Workshop
    • Upcoming workshop
    • Seismic Hazard Mitigation using Passive Damper Systems
  • Archives

    • ► 2011
      • Advances in Real Time Hybrid Simulation Workshop (08/26)
      • Upcoming workshop (08/16)
      • Seismic Hazard Mitigation using Passive Damper Sys … (03/21)
      • Distributed RT Hybrid Testing (03/17)
      • Pictures from William Allen HS Field Trip (03/08)
      • Student Field Trip this Friday (02/22)
      • Testing on passive damping systems (02/18)
      • NEES equipment maintenance (01/17)
      • "Megaquake 10.0" History Channel Special … (01/11)
    • ► 2010
      • MR Damper Projects (12/28)
      • SteelDay 2010 (09/24)
      • ATLSS Welcomes the 2010 NEES REU Students (06/01)
    • ► 2009
      • Three ATLSS Center researchers honored by American … (07/08)
      • ATLSS welcomes the 2009 REU Students (05/27)
      • Lehigh Webinar for RTMD users (02/18)
    • ► 2008
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (11/06)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/31)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/28)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/21)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/17)
      • ATLSS involved in Discovery Channel program (09/25)
      • "The Works" highlights ATLSS (08/25)
      • RTMD hosts Launch-IT (07/23)
      • ATLSS Seminar: Overview of Structures for 2008 Oly … (05/28)
      • 2008 NEES REU program begins (05/27)
      • Germantown High students get all shook up on field … (05/14)
      • 3D Model Panel for RDV Update (03/19)
    • ► 2007
      • RTMD Highlights for November, 2007 (11/01)
      • RTMD Highlights for October, 2007 (10/01)
      • RTMD Highlights for September, 2007 (09/01)
      • RTMD Highlights for June, 2007 (06/01)
      • RTMD Highlights for May, 2007 (05/01)
      • RTMD Highlights for February, 2007 (02/01)
    • ► 2006
      • RTMD Highlights for November, 2006 (11/01)
      • RTMD Highlights for July, 2006 (07/01)
      • RTMD Highlights for June, 2006 (06/01)
      • RTMD Highlights for May, 2006 (05/01)
      • RTMD Highlights for April, 2006 (04/01)
      • RTMD Highlights for March, 2006 (03/01)
      • RTMD Highlights for February, 2006 (02/01)
      • RTMD Highlights for January, 2006 (01/01)
    • ► 2005
      • RTMD Highlights for December, 2005 (12/01)
      • RTMD Highlights for November, 2005 (11/01)
      • Hybrid Testing Workshop in San Diego (10/01)
      • E-Defense Workshop (08/01)
      • Self Centering Workshop (06/01)
    • ► 2004
      • NEES@Lehigh begins (10/01)
  •    February  2012 »
    SMTWTFS
     1234
    567891011
    1213
    February 13, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    14
    February 14, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    15
    February 15, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    16
    February 16, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    17
    February 17, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    18
    February 18, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    19
    February 19, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    20
    February 20, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    21
    February 21, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    22
    February 22, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    23
    February 23, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    24
    February 24, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    25
    February 25, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    26
    February 26, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    27
    February 27, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    28
    February 28, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    29
    February 29, 2012
    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

     
  • Equipment Calendar

    [site map] Copyright © 2011 · All Rights Reserved · Lehigh University
    This site is supported by the George E. Brown, Jr. Network for Earthquake Engineering Simulation (NEES) Program of the National Science Foundation under Award Number CMMI-0927178