NEES@Lehigh
  • Home
  • Facility
    • ATLSS Facility
    • Personnel
    • IT Security
  • Safety
  • Projects
    • Self-Centering Steel Frame Systems
      • Energy Dissipation Elements
      • Moment Resisting Frame
      • Concentrically-Braced Frame
    • Advanced Damping Systems
    • Elastomeric Structural Damper
      • PBD for Seismic Hazard Mitigation
      • Experimental Investigation
      • Performance-Based Design
    • Real-time Hybrid Testing
    • Diaphragm Seismic Design Methodology
    • MISST
    • Buckling-Restrained Braced Frame
      • Buckling-Restrained Braced Frame Videos
    • MRF System with CFT Columns
  • Resources
    • User’s Guide
    • Live Video
    • Calendar
    • Supported Software
    • RDV
    • Publications
      • 2010
      • 2009
      • 2008
      • 2007
      • 2006
      • 2005
      • 2004
      • 2003
      • 2002
    • Lehigh Data Model
    • Workshops
  • Multimedia
    • Photos
      • William Allen High School Trip
      • Elastomeric Damper Installation
      • MISST Construction
      • SC-CBF Base Detail Study
      • BRBF Construction
      • BRBF Testing
      • BRBF Results
      • Composite MRF System with CFT Column Setup
      • Composite MRF System with CFT Column Results
    • Videos
  • News
  • Contact
  • Links
You are here: Home / Projects / Diaphragm Seismic Design Methodology

Diaphragm Seismic Design Methodology


Project Overview

The DSDM project is a collaboration of the University of Arizona (UA), UCSD, LU, and the Precast/Prestressed Concrete Institute (PCI). The research is a closely integrated analytical and experimental effort intended to significantly advance knowledge of the seismic behavior of precast floor diaphragms with the specific objective of producing an appropriate seismic design methodology for eventual code implementation.

As part of the University of Arizona, Lehigh University, and University of California San Diego collaboratory,research project Development of a Seismic Design Methodology for Precast Diaphragms a second phase of experimental research is proposed by Lehigh University (LU). This phase will examine the performance of mutiple diaphragm connection details.

Timelapsed Video of Test Results

Top Connection

Please enable Javascript to view the video

Bottom Connection

Please enable Javascript to view the video

Connection #2

Please enable Javascript to view the video

Connection #6

Please enable Javascript to view the video
  • Categories

    • News and Events (41)
    • Project Spotlight (7)
  • Recent News

    • Researchers probe how strong buildings must be to survive tsunamis
    • Advances in Real Time Hybrid Simulation Workshop
    • Upcoming workshop
  • Archives

    • ► 2012
      • Researchers probe how strong buildings must be to … (03/20)
    • ► 2011
      • Advances in Real Time Hybrid Simulation Workshop (08/26)
      • Upcoming workshop (08/16)
      • Seismic Hazard Mitigation using Passive Damper Sys … (03/21)
      • Distributed RT Hybrid Testing (03/17)
      • Pictures from William Allen HS Field Trip (03/08)
      • Student Field Trip this Friday (02/22)
      • Testing on passive damping systems (02/18)
      • NEES equipment maintenance (01/17)
      • "Megaquake 10.0" History Channel Special … (01/11)
    • ► 2010
      • MR Damper Projects (12/28)
      • SteelDay 2010 (09/24)
      • ATLSS Welcomes the 2010 NEES REU Students (06/01)
    • ► 2009
      • Three ATLSS Center researchers honored by American … (07/08)
      • ATLSS welcomes the 2009 REU Students (05/27)
      • Lehigh Webinar for RTMD users (02/18)
    • ► 2008
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (11/06)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/31)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/28)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/21)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/17)
      • ATLSS involved in Discovery Channel program (09/25)
      • "The Works" highlights ATLSS (08/25)
      • RTMD hosts Launch-IT (07/23)
      • ATLSS Seminar: Overview of Structures for 2008 Oly … (05/28)
      • 2008 NEES REU program begins (05/27)
      • Germantown High students get all shook up on field … (05/14)
      • 3D Model Panel for RDV Update (03/19)
    • ► 2007
      • RTMD Highlights for November, 2007 (11/01)
      • RTMD Highlights for October, 2007 (10/01)
      • RTMD Highlights for September, 2007 (09/01)
      • RTMD Highlights for June, 2007 (06/01)
      • RTMD Highlights for May, 2007 (05/01)
      • RTMD Highlights for February, 2007 (02/01)
    • ► 2006
      • RTMD Highlights for November, 2006 (11/01)
      • RTMD Highlights for July, 2006 (07/01)
      • RTMD Highlights for June, 2006 (06/01)
      • RTMD Highlights for May, 2006 (05/01)
      • RTMD Highlights for April, 2006 (04/01)
      • RTMD Highlights for March, 2006 (03/01)
      • RTMD Highlights for February, 2006 (02/01)
      • RTMD Highlights for January, 2006 (01/01)
    • ► 2005
      • RTMD Highlights for December, 2005 (12/01)
      • RTMD Highlights for November, 2005 (11/01)
      • Hybrid Testing Workshop in San Diego (10/01)
      • E-Defense Workshop (08/01)
      • Self Centering Workshop (06/01)
    • ► 2004
      • NEES@Lehigh begins (10/01)
  •    May  2012 »
    SMTWTFS
     12345
    6789101112
    13141516
    May 16, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    17
    May 17, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    18
    May 18, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    19
    May 19, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    20
    May 20, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    21
    May 21, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    22
    May 22, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    23
    May 23, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    24
    May 24, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    25
    May 25, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    26
    May 26, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    27
    May 27, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    28
    May 28, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    29
    May 29, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    30
    May 30, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    31
    May 31, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

     
  • Equipment Calendar

    [site map] Copyright © 2011 · All Rights Reserved · Lehigh University
    This site is supported by the George E. Brown, Jr. Network for Earthquake Engineering Simulation (NEES) Program of the National Science Foundation under Award Number CMMI-0927178