NEES@Lehigh
  • Home
  • Facility
    • ATLSS Facility
    • Personnel
    • IT Security
  • Safety
  • Projects
    • Self-Centering Steel Frame Systems
      • Energy Dissipation Elements
      • Moment Resisting Frame
      • Concentrically-Braced Frame
    • Advanced Damping Systems
    • Elastomeric Structural Damper
      • PBD for Seismic Hazard Mitigation
      • Experimental Investigation
      • Performance-Based Design
    • Real-time Hybrid Testing
    • Diaphragm Seismic Design Methodology
    • MISST
    • Buckling-Restrained Braced Frame
      • Buckling-Restrained Braced Frame Videos
    • MRF System with CFT Columns
  • Resources
    • User’s Guide
    • Live Video
    • Calendar
    • Supported Software
    • RDV
    • Publications
      • 2010
      • 2009
      • 2008
      • 2007
      • 2006
      • 2005
      • 2004
      • 2003
      • 2002
    • Lehigh Data Model
    • Workshops
  • Multimedia
    • Photos
      • William Allen High School Trip
      • Elastomeric Damper Installation
      • MISST Construction
      • SC-CBF Base Detail Study
      • BRBF Construction
      • BRBF Testing
      • BRBF Results
      • Composite MRF System with CFT Column Setup
      • Composite MRF System with CFT Column Results
    • Videos
  • News
  • Contact
  • Links
You are here: Home / Projects / Elastomeric Structural Damper / Experimental Investigation

Experimental Investigation of a Prototype Elastomeric Structural Damper


Project Overview

For many years, the design of seismic resistant building structures has had the goal of preventing collapse, and avoiding injury and loss of life in the event of an earthquake. More recently, seismic design practice has sought to reduce structural damage and nonstructural damage from seismic events. A variety of seismic protective systems are now utilized to reduce structural response to seismic loading.

A viscoelastic damper is a seismic protective device that decreases structural response to seismic loading (ChangĀ et al. 1993, Fan 1998). These dampers, however, have mechanical properties which are sensitive to frequency of loading and temperature, and limit their effectiveness (Fan 1998). An elastomeric damper uses a similar material, but is less sensitive to frequency of loading and temperature (Lee 2003). However, elastomeric dampers generally provide less damping than viscoelastic dampers. This study focuses on a prototype elastomeric structural damper developed by Penn State Erie and the Corry Rubber Company, with input from researchers at Lehigh University. The damper uses a high damping elastomer pre-compressed into steel tubes, and is called the Ultra High Damped Elastomer Tube (UHDET) damper. Within this thesis, this damper is called “the prototype UHDET damper” or, more simply, “the prototype damper.” The prototype damper incorporates both elastomeric and frictional damping to increase the total damping output, and takes advantage of the low sensitivity of elastomeric materials to frequency of loading and temperature.

Summary and Conclusion

This study focused on a prototype structural damper called the Ultra High Damped Elastomer Tube (UHDET) damper. This prototype damper was developed by a team, composed of Penn State Erie and the Corry Rubber Company, with input from Lehigh University, for use in reducing seismic response in new and existing buildings.

The prototype damper is an innovative design, compared to previously developed elastomeric dampers, through the use of a pre-compressed elastomeric material within steel tubes to produce both elastomeric and friction damping output. The objective of this study was to characterize the behavior of the prototype damper under dynamic loading through experimental tests and to determine its effectiveness in reducing the seismic response of a prototype building. The scope of work to meet this objective included three tasks: (1) to conduct a performance based design study of a damped prototype building to establish behavior goals for the prototype damper, (2) to develop an experimental program based on the damped prototype building design study to characterize the prototype damper, and (3) to use the experimental results to characterize the prototype damper behavior and properties.

Based on the results of the study, several conclusions can be made:

  • The prototype UHDET damper behavior is sensitive to deformation amplitude with less sensitivity to loading frequency.
  • The damper stiffness decreases significantly as deformation amplitude increases.
  • The damper deformation capacity in the elastic range (before slip) is very limited.
  • When assumed to be half scale, the prototype dampers that were tested meet the behavior goals established from the damped prototype building study. However, a large number of dampers will need to be incorporated into the prototype building to meet the performance objectives of the design study.
  • The use of the pre-compressed elastomer material within steel tubes creates a frictional behavior with a high damping output.
  • The pre-compression and friction also allow the prototype damper to continue to resist force after bond failure.
  • The prototype dampers tested are extremely robust. The dampers underwent numerous cycles of deformation without significant degradation of their behavior.

Participants

Graduate Research Assistant

  • Angela Kontopanos – Lehigh University

Faculty Advisors

  • James Ricles – Lehigh University
  • Richard Sause – Lehigh University

Post-Doctoral Research Associates

  • Kyung Sik Lee – Lehigh University
  • Choung Yeol Seo – Lehigh University

Academic Collaborators

  • Robert Michael – Penn State Erie
  • Shannon Sweeney – Penn State Erie

Industry

  • Corry Rubber Company

Sinusoidal experiment video

Please enable Javascript to view the video

  • Categories

    • News and Events (41)
    • Project Spotlight (7)
  • Recent News

    • Researchers probe how strong buildings must be to survive tsunamis
    • Advances in Real Time Hybrid Simulation Workshop
    • Upcoming workshop
  • Archives

    • ► 2012
      • Researchers probe how strong buildings must be to … (03/20)
    • ► 2011
      • Advances in Real Time Hybrid Simulation Workshop (08/26)
      • Upcoming workshop (08/16)
      • Seismic Hazard Mitigation using Passive Damper Sys … (03/21)
      • Distributed RT Hybrid Testing (03/17)
      • Pictures from William Allen HS Field Trip (03/08)
      • Student Field Trip this Friday (02/22)
      • Testing on passive damping systems (02/18)
      • NEES equipment maintenance (01/17)
      • "Megaquake 10.0" History Channel Special … (01/11)
    • ► 2010
      • MR Damper Projects (12/28)
      • SteelDay 2010 (09/24)
      • ATLSS Welcomes the 2010 NEES REU Students (06/01)
    • ► 2009
      • Three ATLSS Center researchers honored by American … (07/08)
      • ATLSS welcomes the 2009 REU Students (05/27)
      • Lehigh Webinar for RTMD users (02/18)
    • ► 2008
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (11/06)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/31)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/28)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/21)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/17)
      • ATLSS involved in Discovery Channel program (09/25)
      • "The Works" highlights ATLSS (08/25)
      • RTMD hosts Launch-IT (07/23)
      • ATLSS Seminar: Overview of Structures for 2008 Oly … (05/28)
      • 2008 NEES REU program begins (05/27)
      • Germantown High students get all shook up on field … (05/14)
      • 3D Model Panel for RDV Update (03/19)
    • ► 2007
      • RTMD Highlights for November, 2007 (11/01)
      • RTMD Highlights for October, 2007 (10/01)
      • RTMD Highlights for September, 2007 (09/01)
      • RTMD Highlights for June, 2007 (06/01)
      • RTMD Highlights for May, 2007 (05/01)
      • RTMD Highlights for February, 2007 (02/01)
    • ► 2006
      • RTMD Highlights for November, 2006 (11/01)
      • RTMD Highlights for July, 2006 (07/01)
      • RTMD Highlights for June, 2006 (06/01)
      • RTMD Highlights for May, 2006 (05/01)
      • RTMD Highlights for April, 2006 (04/01)
      • RTMD Highlights for March, 2006 (03/01)
      • RTMD Highlights for February, 2006 (02/01)
      • RTMD Highlights for January, 2006 (01/01)
    • ► 2005
      • RTMD Highlights for December, 2005 (12/01)
      • RTMD Highlights for November, 2005 (11/01)
      • Hybrid Testing Workshop in San Diego (10/01)
      • E-Defense Workshop (08/01)
      • Self Centering Workshop (06/01)
    • ► 2004
      • NEES@Lehigh begins (10/01)
  •    May  2012 »
    SMTWTFS
     12345
    6789101112
    13141516
    May 16, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    17
    May 17, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    18
    May 18, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    19
    May 19, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    20
    May 20, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    21
    May 21, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    22
    May 22, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    23
    May 23, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    24
    May 24, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    25
    May 25, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    26
    May 26, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    27
    May 27, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    28
    May 28, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    29
    May 29, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    30
    May 30, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    31
    May 31, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

     
  • Equipment Calendar

    [site map] Copyright © 2011 · All Rights Reserved · Lehigh University
    This site is supported by the George E. Brown, Jr. Network for Earthquake Engineering Simulation (NEES) Program of the National Science Foundation under Award Number CMMI-0927178