NEES@Lehigh
  • Home
  • Facility
    • ATLSS Facility
    • Personnel
    • IT Security
  • Safety
  • Projects
    • Self-Centering Steel Frame Systems
      • Energy Dissipation Elements
      • Moment Resisting Frame
      • Concentrically-Braced Frame
    • Advanced Damping Systems
    • Elastomeric Structural Damper
      • PBD for Seismic Hazard Mitigation
      • Experimental Investigation
      • Performance-Based Design
    • Real-time Hybrid Testing
    • Diaphragm Seismic Design Methodology
    • MISST
    • Buckling-Restrained Braced Frame
      • Buckling-Restrained Braced Frame Videos
    • MRF System with CFT Columns
  • Resources
    • User’s Guide
    • Live Video
    • Calendar
    • Supported Software
    • RDV
    • Publications
      • 2010
      • 2009
      • 2008
      • 2007
      • 2006
      • 2005
      • 2004
      • 2003
      • 2002
    • Lehigh Data Model
    • Workshops
  • Multimedia
    • Photos
      • William Allen High School Trip
      • Elastomeric Damper Installation
      • MISST Construction
      • SC-CBF Base Detail Study
      • BRBF Construction
      • BRBF Testing
      • BRBF Results
      • Composite MRF System with CFT Column Setup
      • Composite MRF System with CFT Column Results
    • Videos
  • News
  • Contact
  • Links
You are here: Home / Projects / MRF System with CFT Columns

Seismic Performance Evaluation of a Large-Scale Composite MRF System with CFT Columns


Project Overview

The seismic performance of a composite moment resisting frame (MRF) comprised of concrete filled tube (CFT) columns and wide flange beams was investigated experimentally. The four-story composite MRF test structure was designed using performance-based design concepts. The performance objectives include achieving: (1) the operational performance level under the frequent occurrence earthquake; (2) the life safety performance level under the design basis earthquake; and (3) the collapse prevention performance level under the maximum considered earthquake. The hybrid pseudodynamic test method was used to subject the test structure to these various seismic input levels. P-Δ effects associated with the gravity frames in the prototype building were included analytically in the tests. Results from the tests indicated that the structural performance under the simulated seismic loading was consistent with the expected performance for all three earthquake levels, indicating that effective seismic performance of composite MRFs with CFT columns can be achieved.

Test Matrix

Test Record Earthquake Recording Station Accelerogram Scale Factor Earthquake Hazard Level Test Method
FOE 1979 Imperial Valley Array 06 0.400 FOE PSD
DBE 1994 Northridge Canoga Park 1.275 DBE PSD
MCE 1994 Northridge Canoga Park 1.912 MCE PSD
DBE-A 1994 Northridge Canoga Park 1.275 DBE PSD

Summary

To investigate the seismic behavior of CFT-MRF systems, a 0.6 scale CFT-MRF test structure was developed from a prototype building designed using performance based design criteria, and was tested in the laboratory. The pseudodynamic hybrid test method was used to subject the test structure to several ground motions representative of three earthquake input levels, namely, the FOE, DBE, and MCE. The performance objectives for the structure included a fully operational  condition under the FOE, and the life safety performance level and the collapse prevention performance level under the DBE and MCE, respectively. The IBC 2000 provisions were used to establish the required strength and stiffness of the structure. A weak beam-strong column configuration in the design was achieved using the AISC-LRFD criteria for the beam capacity and the ACI criteria for the CFT column capacity. Split tee beam-to-column moment connections were used to enable plastic hinges to form in the beams.

The test structure developed minor yielding during the FOE test. During the DBE test, the structure responded as a weak beam-strong column system, with extensive beam yielding and incipient beam local flange and web distortion at a few plastic hinge regions. The design drift limit of 2.5% was exceeded under the DBE, however, no strength degradation occurred. During the MCE test, extensive beam local buckling and yielding occurred in the beams, as well as yielding and concrete crushing at the base of the first story columns. In addition, the steel tube at the base of the first story center column fractured at the net section of the tube at the beam-to-column connection. This damage to the test structure during the MCE did not cause collapse, and stable, ductile behavior was observed. The test structure sustained a subsequent DBE level aftershock, thereby exceeding the requirements of the collapse prevention performance level.

The test structure response was consistent with the expected performance for all seismic input levels, indicating that effective seismic performance of composite MRFs with CFT columns can be achieved. The system overstrength during the DBE and MCE tests was 3.11 and 3.54, respectively, and was greater than the value of 3.0 for special MRFs in current seismic design provisions. Consequently, an overstrength factor value larger than 3.0 should be considered in design. The net section fracture at the ground floor level of a CFT column with a split tee beam-to-column connection can be avoided by reinforcing the net section such that the plastic hinge forms in the gross section of the column above the net section.

The experimental data from the test structure has enabled the verification of analytical models for CFT-MRF members and systems. Analytical models developed by the writers were shown to accurately predict the test structure response (Herrera 2005).  These models were also utilized to analyze the prototype structure under numerous ground motions scaled to the DBE and MCE. Performance similar to that observed in the test structure was observed at these two earthquake input levels.

Composite MRF System with CFT Column Setup Photos
Composite MRF System with CFT Column Setup Photos

Setup photos for the Composite MRF system with CFT Columns

6 Photos

Composite MRF System with CFT Column Results Photos
Composite MRF System with CFT Column Results Photos

Photos and plots from the Composite MRF system with CFT Columns testing.

12 Photos

Related Publications

  • Herrera, R. (2005). “Seismic behavior of concrete filled tube column-wide flange beam frames.” Ph.D. thesis, Lehigh Univ., Bethlehem, Pa.
  • Ricles, J. M., Peng, S. W., and Lu, L.-W. (2004). “Seismic behavior of composite concrete filled steel tube column-wide flange beam moment connections.” J. Struct. Eng., 130 (2), 223–232.
  • Peng, S. W., Ricles, J. M., and Lu, L. W. (2001). “Seismic resistant connections for concrete filled column-to-WF beam MRFs.” Rep. No. 01-08, ATLSS Engineering Research Center, Lehigh Univ., Bethlehem, Pa.
  • Varma, A., Ricles, J. M., Sause, R., and Lu, L. W. (2002). “Seismic behavior and modeling of high-strength composite concrete-filled steel tube (CFT) beam–columns.” J. Constr. Steel Res., 58, 725–758.

Participants

Graduate Research Assistant

  • Ricardo Herrera

Faculty Advisors

  • James Ricles
  • Richard Sause

Sponsors

  • National Science Foundation (NSF)
  • Pennsylvania Infrastructure Technology Alliance(PITA), Pennsylvania Department of Community and Economic Development
  • Pennsylvania D.C.E.D., Pennsylvania Department of Community and Economic Development
  • Steel Tube Institute of North America

Timelapsed Video Results

Overview from South

Please enable Javascript to view the video

Overview

Please enable Javascript to view the video

Closeup of CFT from the South

Please enable Javascript to view the video

Fourth Floor Connection

Please enable Javascript to view the video

Closeup of Connection

Please enable Javascript to view the video

Composition of Video and Data

Please enable Javascript to view the video
  • Categories

    • News and Events (41)
    • Project Spotlight (7)
  • Recent News

    • Researchers probe how strong buildings must be to survive tsunamis
    • Advances in Real Time Hybrid Simulation Workshop
    • Upcoming workshop
  • Archives

    • ► 2012
      • Researchers probe how strong buildings must be to … (03/20)
    • ► 2011
      • Advances in Real Time Hybrid Simulation Workshop (08/26)
      • Upcoming workshop (08/16)
      • Seismic Hazard Mitigation using Passive Damper Sys … (03/21)
      • Distributed RT Hybrid Testing (03/17)
      • Pictures from William Allen HS Field Trip (03/08)
      • Student Field Trip this Friday (02/22)
      • Testing on passive damping systems (02/18)
      • NEES equipment maintenance (01/17)
      • "Megaquake 10.0" History Channel Special … (01/11)
    • ► 2010
      • MR Damper Projects (12/28)
      • SteelDay 2010 (09/24)
      • ATLSS Welcomes the 2010 NEES REU Students (06/01)
    • ► 2009
      • Three ATLSS Center researchers honored by American … (07/08)
      • ATLSS welcomes the 2009 REU Students (05/27)
      • Lehigh Webinar for RTMD users (02/18)
    • ► 2008
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (11/06)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/31)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/28)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/21)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/17)
      • ATLSS involved in Discovery Channel program (09/25)
      • "The Works" highlights ATLSS (08/25)
      • RTMD hosts Launch-IT (07/23)
      • ATLSS Seminar: Overview of Structures for 2008 Oly … (05/28)
      • 2008 NEES REU program begins (05/27)
      • Germantown High students get all shook up on field … (05/14)
      • 3D Model Panel for RDV Update (03/19)
    • ► 2007
      • RTMD Highlights for November, 2007 (11/01)
      • RTMD Highlights for October, 2007 (10/01)
      • RTMD Highlights for September, 2007 (09/01)
      • RTMD Highlights for June, 2007 (06/01)
      • RTMD Highlights for May, 2007 (05/01)
      • RTMD Highlights for February, 2007 (02/01)
    • ► 2006
      • RTMD Highlights for November, 2006 (11/01)
      • RTMD Highlights for July, 2006 (07/01)
      • RTMD Highlights for June, 2006 (06/01)
      • RTMD Highlights for May, 2006 (05/01)
      • RTMD Highlights for April, 2006 (04/01)
      • RTMD Highlights for March, 2006 (03/01)
      • RTMD Highlights for February, 2006 (02/01)
      • RTMD Highlights for January, 2006 (01/01)
    • ► 2005
      • RTMD Highlights for December, 2005 (12/01)
      • RTMD Highlights for November, 2005 (11/01)
      • Hybrid Testing Workshop in San Diego (10/01)
      • E-Defense Workshop (08/01)
      • Self Centering Workshop (06/01)
    • ► 2004
      • NEES@Lehigh begins (10/01)
  •    May  2012 »
    SMTWTFS
     12345
    6789101112
    13141516
    May 16, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    17
    May 17, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    18
    May 18, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    19
    May 19, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    20
    May 20, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    21
    May 21, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    22
    May 22, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    23
    May 23, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    24
    May 24, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    25
    May 25, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    26
    May 26, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    27
    May 27, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    28
    May 28, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    29
    May 29, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    30
    May 30, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    31
    May 31, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

     
  • Equipment Calendar

    [site map] Copyright © 2011 · All Rights Reserved · Lehigh University
    This site is supported by the George E. Brown, Jr. Network for Earthquake Engineering Simulation (NEES) Program of the National Science Foundation under Award Number CMMI-0927178