NEES@Lehigh
  • Home
  • Facility
    • ATLSS Facility
    • Personnel
  • Safety
  • Projects
    • Self-Centering Steel Frame Systems
      • Energy Dissipation Elements
      • Moment Resisting Frame
      • Concentrically-Braced Frame
    • Advanced Damping Systems
    • Elastomeric Structural Damper
      • PBD for Seismic Hazard Mitigation
      • Experimental Investigation
      • Performance-Based Design
    • Real-time Hybrid Testing
    • Diaphragm Seismic Design Methodology
    • MISST
    • Buckling-Restrained Braced Frame
      • Buckling-Restrained Braced Frame Videos
    • MRF System with CFT Columns
  • Resources
    • User’s Guide
    • Live Video
    • Calendar
    • Supported Software
    • RDV
    • Publications
      • 2010
      • 2009
      • 2008
      • 2007
      • 2006
      • 2005
      • 2004
      • 2003
      • 2002
    • Lehigh Data Model
    • Workshops
  • Multimedia
    • Photos
      • William Allen High School Trip
      • Elastomeric Damper Installation
      • MISST Construction
      • SC-CBF Base Detail Study
      • BRBF Construction
      • BRBF Testing
      • BRBF Results
      • Composite MRF System with CFT Column Setup
      • Composite MRF System with CFT Column Results
    • Videos
  • News
  • Contact
  • Links
You are here: Home / Resources / Publications / 2005

2005


  • Bruneau, Michel, Michael Engelhardt, Andre Filiatrault, S.C. Goel, Ahmad Itani, Jerome Hajjar, Roberto Leon, James Ricles, Bozidar Stojadinovic, Chia-Ming Uang, “Review of Selected Recent Research On US Seismic Design And Retrofit Strategies For Steel Structures,” Journal of Progress in Structural Engineering Materials, Vol. 7, pp. 103-114, 2005.
  • Fleischman, R. B., Naito, C., Restrepo, J., Sause, R., Ghosh, S. K., Wan, G., Schoettler, M., Cao, L. “Precast Diaphragm Seismic Design Methodology (DSDM) Project, Part 2: Research Program,” Journal of the Precast/Prestressed Concrete Institute, Vol. 50, No. 6, Nov.-Dec., 2005, pp. 14-31.
  • Fleischman, R., Naito, C., Restrepo, J., Sause, R., Ghosh, S., “Precast Diaphragm Seismic Design Methodology (DSDM) Project, Part 1:Design Philosophy and Research Approach,” Journal of the Precast/Prestressed Concrete Institute, Vol. 50, No. 5, Sept.-Oct., 2005, pp. 68-83.
  • Garlock, M.M., Ricles J.M., and R. Sause, “Experimental Studies On Full-Scale Post-Tensioned Steel Connections,” Journal of Structural Engineering, ASCE, Vol. 131(3), pp. 438-448, 2005.
  • Ricles, J.M. and X. Zhang, “Recent Research on Seismic Behavior of Deep Column-To-Beam Welded RBS Moment Connections and Design Implications,” Proceedings of the North American Steel Construction Conference, AISC, Montreal, Canada, April 2005.
  • Rojas, P., Garlock, M., Ricles, J., and Sause, R., “Use of Post-Tensioned Friction Damped Connections for Seismic Retrofit of Steel Moment Resisting Frames,” International Journal of Steel Structures, 5(3), pp. 265-276, 2005.
  • Rojas, P., Ricles, J.M., and R. Sause, “Seismic Performance of Post-Tensioned Steel MRFs With Friction Devices,” Journal of Structural Engineering, ASCE, Vol. 131(4), pp. 529-540, 2005.
  • Varma, A.H., Sause, R., Ricles, J.M., and L. Qinggang, “Development and Validation of Fiber Models for High Strength Square Concrete Filled Steel Tube (CFT) Beam-Columns,” Structural Journal, ACI, Vol. 102, No. 1, pp. 73-84, 2005.
  • Wolski, M., Ricles, J.M., Sause, R. and K.S. Lee, “Energy Dissipation For Self-Centering Steel Moment Resisting Frames: Bottom Flange Friction Device,” Proceedings, U.S. -Taiwan Workshop on Self-Centering Structural Systems, NCREE, Taiwan, June 2005.
  • Zhang, Y., and Li, J. (2005). “DPCM-based vibration sensor data compression and its effect on structural system identification ,” Journal of Earthquake Engineering and Engineering Vibration, 4(1): 153-163.
  • Zhang, Y., and Li, J. (2005). “Efficient seismic response data storage and transmission using ARX model-based sensor data compression algorithm,” Earthquake Engineering and Structural Dynamics, 35: 781-788.
  • Zhang, X., and J.M. Ricles. “NEES Real-Time Multi-Directional Earthquake Simulation Facility Servo Hydraulic System Acceptance Test,” ATLSS Report No. 05-13, Center for Advanced Technology for Large Structural Systems, Lehigh University, Bethlehem, PA., June 2005.
  • Zhang, X., and Ricles, J. “Seismic Behavior Of Reduced Beam Section Moment Connections To Deep Columns,” Journal of Structural Engineering, ASCE, to appear, 2005.
  • Zhang, X., and Ricles, J.M., “Servohydraulic System Identification”, ATLSS Report 05-14, June 2005.
  • Zhang, X., Ricles, J.M., Mercan, O. and C. Chen. “Servo-Hydraulic System Identification for the NEES Real-Time Multi-Directional Earthquake Simulation Facility,” ATLSS Report No. 05-14, Center for Advanced Technology for Large Structural Systems, Lehigh University, Bethlehem, PA., June 2005.
  • Zhang, Y., Sause, R., Ricles, J., Naito, C., “Modified Predictor-Corrector Numerical Scheme for Real-Time Pseudo Dynamic Rest Using State-Space Formulation,” Journal of Earthquake Engineering and Structural Dynamics, Vol. 34, No. 3, Mar., 2005, pp. 271-288.
  • Categories

    • News and Events (40)
    • Project Spotlight (7)
  • Recent News

    • Advances in Real Time Hybrid Simulation Workshop
    • Upcoming workshop
    • Seismic Hazard Mitigation using Passive Damper Systems
  • Archives

    • ► 2011
      • Advances in Real Time Hybrid Simulation Workshop (08/26)
      • Upcoming workshop (08/16)
      • Seismic Hazard Mitigation using Passive Damper Sys … (03/21)
      • Distributed RT Hybrid Testing (03/17)
      • Pictures from William Allen HS Field Trip (03/08)
      • Student Field Trip this Friday (02/22)
      • Testing on passive damping systems (02/18)
      • NEES equipment maintenance (01/17)
      • "Megaquake 10.0" History Channel Special … (01/11)
    • ► 2010
      • MR Damper Projects (12/28)
      • SteelDay 2010 (09/24)
      • ATLSS Welcomes the 2010 NEES REU Students (06/01)
    • ► 2009
      • Three ATLSS Center researchers honored by American … (07/08)
      • ATLSS welcomes the 2009 REU Students (05/27)
      • Lehigh Webinar for RTMD users (02/18)
    • ► 2008
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (11/06)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/31)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/28)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/21)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/17)
      • ATLSS involved in Discovery Channel program (09/25)
      • "The Works" highlights ATLSS (08/25)
      • RTMD hosts Launch-IT (07/23)
      • ATLSS Seminar: Overview of Structures for 2008 Oly … (05/28)
      • 2008 NEES REU program begins (05/27)
      • Germantown High students get all shook up on field … (05/14)
      • 3D Model Panel for RDV Update (03/19)
    • ► 2007
      • RTMD Highlights for November, 2007 (11/01)
      • RTMD Highlights for October, 2007 (10/01)
      • RTMD Highlights for September, 2007 (09/01)
      • RTMD Highlights for June, 2007 (06/01)
      • RTMD Highlights for May, 2007 (05/01)
      • RTMD Highlights for February, 2007 (02/01)
    • ► 2006
      • RTMD Highlights for November, 2006 (11/01)
      • RTMD Highlights for July, 2006 (07/01)
      • RTMD Highlights for June, 2006 (06/01)
      • RTMD Highlights for May, 2006 (05/01)
      • RTMD Highlights for April, 2006 (04/01)
      • RTMD Highlights for March, 2006 (03/01)
      • RTMD Highlights for February, 2006 (02/01)
      • RTMD Highlights for January, 2006 (01/01)
    • ► 2005
      • RTMD Highlights for December, 2005 (12/01)
      • RTMD Highlights for November, 2005 (11/01)
      • Hybrid Testing Workshop in San Diego (10/01)
      • E-Defense Workshop (08/01)
      • Self Centering Workshop (06/01)
    • ► 2004
      • NEES@Lehigh begins (10/01)
  •    February  2012 »
    SMTWTFS
     1234
    567891011
    1213
    February 13, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    14
    February 14, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    15
    February 15, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    16
    February 16, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    17
    February 17, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    18
    February 18, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    19
    February 19, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    20
    February 20, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    21
    February 21, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    22
    February 22, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    23
    February 23, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    24
    February 24, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    25
    February 25, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    26
    February 26, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    27
    February 27, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    28
    February 28, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    29
    February 29, 2012
    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

     
  • Equipment Calendar

    [site map] Copyright © 2011 · All Rights Reserved · Lehigh University
    This site is supported by the George E. Brown, Jr. Network for Earthquake Engineering Simulation (NEES) Program of the National Science Foundation under Award Number CMMI-0927178