NEES@Lehigh
  • Home
  • Facility
    • ATLSS Facility
    • Personnel
    • IT Security
  • Safety
  • Projects
    • Self-Centering Steel Frame Systems
      • Energy Dissipation Elements
      • Moment Resisting Frame
      • Concentrically-Braced Frame
    • Advanced Damping Systems
    • Elastomeric Structural Damper
      • PBD for Seismic Hazard Mitigation
      • Experimental Investigation
      • Performance-Based Design
    • Real-time Hybrid Testing
    • Diaphragm Seismic Design Methodology
    • MISST
    • Buckling-Restrained Braced Frame
      • Buckling-Restrained Braced Frame Videos
    • MRF System with CFT Columns
  • Resources
    • User’s Guide
    • Live Video
    • Calendar
    • Supported Software
    • RDV
    • Publications
      • 2010
      • 2009
      • 2008
      • 2007
      • 2006
      • 2005
      • 2004
      • 2003
      • 2002
    • Lehigh Data Model
    • Workshops
  • Multimedia
    • Photos
      • William Allen High School Trip
      • Elastomeric Damper Installation
      • MISST Construction
      • SC-CBF Base Detail Study
      • BRBF Construction
      • BRBF Testing
      • BRBF Results
      • Composite MRF System with CFT Column Setup
      • Composite MRF System with CFT Column Results
    • Videos
  • News
  • Contact
  • Links
You are here: Home / Resources / Publications / 2010

2010


  • Chae, Y., Ricles, J., Sause, R., Dong, B., Chen, C., Christenson, R., Dyke, S., Agrawal, A., and B. Spencer,” Experimental Studies on Control Strategies for Steel Frames with MR Dampers for Earthquake Hazard Reduction,” Proceedings of the 5th World Conference on Structural Control and Monitoring, Tokyo, Japan, July 10-12, 2010.
  • Chae, Y., Ricles, J.M., and R. Sause. “Development of a Large-Scale MR Damper Model for Seismic Hazard Mitigation Assessment of Structures,” Proceedings, 9th National and 10th Canadian Conference on Earthquake Engineering, Toronto, Canada, July 25-29, 2010.
  • Chae, Y., Ricles, J.M., Sause, R., and R. Christenson, “Evaluation of Structural Control Strategies for Buildings with MR Dampers Using Real-Time Large-Scale Hybrid Simulation,” Proceedings of the ASCE Structures Congress, Orlando, Florida, May 12-May 14, 2010.
  • Chen ,C. and J.M. Ricles, “Stability Analysis of Direct Integration Algorithms Applied to MDOF Nonlinear Structural Dynamics,” Journal of Engineering Mechanics, ASCE, http://dx.doi.org/10.1061/(ASCE)EM.1943-7889.0000083, 136(4), 2010.
  • Chen, C. and J.M. Ricles, “Tracking Error-Based Servo-Hydraulic Actuator Adaptive Compensation for Real-Time Hybrid Simulation,” Journal of Structural Engineering, ASCE, 136(4), pp. 432- 440, 2010.
  • Chen, C., Ricles, J.M., Sause, R., and R. Christensen, “Experimental Evaluation of an Adaptive Actuator Control Technique For Real-Time Simulation of Large-Scale Magneto-Rheological Fluid Damper Subjected To Random Displacement and Variable Current Inputs,” Smart Materials and Structures, doi:10.1088/0964-1726/19/2/025017, 19 (2010) 025017.
  • Chen, C., and J.M. Ricles, “A Model Reference Adaptive Control Based Method for Actuator Delay Estimation in Real-Time Testing.” Journal of Frontiers in Architectural and Civil Engineering, DOI 10.1007/s11709-010-0072-8, 4(3): 277–286, 2010.
  • Chen, C., Ricles, J., Sause, R., and R. Christenson,”Performance Evaluation of an Actuator Delay Compensation Technique using Large-Scale Magneto-Rheological Fluid Dampers Subjected to Variable Current Inputs,” Proceedings of the 5th World Conference on Structural Control and Monitoring, Tokyo, Japan, July 10-12, 2010.
  • Chen, C., Ricles, J.M., Sause, R., and T. Karavasilis. “Experimental Evaluation of Steel MRF Performance with Large Scale Passive Magneto-Rheological Dampers for Seismic Hazard Mitigation Using Real-Time Hybrid Simulation,” Proceedings, 9th National and 10th Canadian Conference on Earthquake Engineering, Toronto, Canada, July 25-29, 2010.
  • Chen, C., and J.M. Ricles. “Actuator Delay Compensation for Real-Time Hybrid Simulation involving Multiple Large-Scale Servo-Hydraulic Actuators,” Proceedings, 9th National and 10th Canadian Conference on Earthquake Engineering, Toronto, Canada, July 25-29, 2010.
  • Chen, C., and J.M. Ricles, “An Unconditionally Stable Explicit Integration Algorithm with Controllable Numerical Damping for Real-Time Testing,” Proceedings of the ASCE Structures Congress, Orlando, Florida, May 12-May 14, 2010.
  • Friedman, A., Zhang, J., Chae, Y., Phillips, B. Jiang, Z., Dyke, S., Agrawal, A., Spencer, B., Christenson, R., Ricles J. and R. Sause, “Accommodating MR Damper Dynamics for Control of Large Scale Structural Systems,” Proceedings of the 5th World Conference on Structural Control and Monitoring, Tokyo, Japan, July 10-12, 2010.
  • Jiang, Z., Mantoni, D., Christenson, R., Chae, Y., Ricles, J., Friedman, A., Dyke, D., Phillips, B., and B. Spencer, “Comparison of 200 kN MR Damper Models for Use in Real-Time Hybrid Simulation,” Proceedings of the 5th World Conference on Structural Control and Monitoring, Tokyo, Japan, July 10-12, 2010.
  • Karavasilis, T., Sause, R., and J.M. Ricles “Seismic Design and Performance of Steel MRFs With Elastomeric Dampers” Proceedings, 9th National and 10th Canadian Conference on Earthquake Engineering, Toronto, Canada, July 25-29, 2010.Ricles, J.M., Karavasilis, T., Sause, R., and C. Chen “Performance Assessment of Building Systems with Elastomeric Dampers using Real-Time Hybrid Simulation,” Proceedings, 9th National and 10th Canadian Conference on Earthquake Engineering, Toronto, Canada, July 25-29, 2010.
  • Karavasilis, T.L., Ricles, J.M., Sause, R. and C. Chen, “Use of Real-Time Hybrid Simulation to Evaluate the Performance-Based Seismic Design of Steel MRFs with Compressed Elastomer Dampers,” Proceedings of the ASCE Structures Congress, Orlando, Florida, May 12-May 14, 2010.
  • Karavasilis, T.L., Sause, R., and J.M. Ricles, “Design of Steel Buildings for Earthquake Conditions Using Next-Generation Elastomeric Dampers,” Proceedings of the ASCE Structures Congress, Orlando, Florida, May 12-May 14, 2010.
  • Phillips, B., Chae, Y., Jiang, Z., Spencer, B., Ricles, J., Christenson, R, Dyke, S., and A. Agrawal, “Real-Time Hybrid Simulation Benchmark Study with a Large-Scale MR Damper,” Proceedings of the 5th World Conference on Structural Control and Monitoring, Tokyo, Japan, July 10-12, 2010.
  • Ricles, J., Sause, R., Karavasilis, T., and C. Chen, “ Performance-Based Seismic Design of Building Systems with Dampers: Experimental Validation Using Real-Time Hybrid Simulation,“ Proceedings 5th International Conference on Earthquake Engineering (5ICEE), Tokyo Institute of Technology, Tokyo, Japan, March 3-5, 2010.
  • Ricles, J.M., R. Sause, Lin, Y.C. and C.Y Seo, “Self-Centering Moment Connnections for Damage-Free Seismic Response of Steel MRFs,” Proceedings of the ASCE Structures Congress, Orlando, Florida, May 12-May 14, 2010.
  • Ricles, J.M.,, Christopoulos, C., Sause, R., and M. Garlock. “Development of Self-Centering Steel Moment-Resisting Frames for Damage-Free Seismic Resistant Design,” Proceedings, 9th National and 10th Canadian Conference on Earthquake Engineering, Toronto, Canada, July 25-29, 2010.
  • Roke, D.A., Sause, R., Ricles, J.M., and N. Chancellor “Damage-Free Seismic-Resistant Self-Centering Concentrically-Braced Frames,” ATLSS Report No. 10-9, Lehigh University, Bethlehem, PA, September 2010.
  • Sause, R., Ricles, J., Lin, Y.C., Seo, C.Y., Roke, D., and Chancellor, B, “ Self-Centering Damage-Free Seismic-Resistant Steel Frame Systems,“ Proceedings 5th International Conference on Earthquake Engineering (5ICEE), Tokyo Institute of Technology, Tokyo, Japan, March 3-5, 2010.
  • Sause, R., Ricles, J.M., Roke, D.A., Chancellor, N.B. and N.P. Gonner, “Seismic Performance of a Self-Centering Rocking Concentrically-Braced Frame,” Proceedings, 9th National and 10th Canadian Conference on Earthquake Engineering, Toronto, Canada, July 25-29, 2010.
  • Sause, R., Ricles, J.M., Roke, D.A., Chancellor, N.B. and N.P. Gonner, “Large-Scale Experimental Studies of Damage-Free Self-Centering Concentrically-Braced Frame under Seismic Loading,” Proceedings of the ASCE Structures Congress, Orlando, Florida, May 12-May 14, 2010.
  • Categories

    • News and Events (41)
    • Project Spotlight (7)
  • Recent News

    • Researchers probe how strong buildings must be to survive tsunamis
    • Advances in Real Time Hybrid Simulation Workshop
    • Upcoming workshop
  • Archives

    • ► 2012
      • Researchers probe how strong buildings must be to … (03/20)
    • ► 2011
      • Advances in Real Time Hybrid Simulation Workshop (08/26)
      • Upcoming workshop (08/16)
      • Seismic Hazard Mitigation using Passive Damper Sys … (03/21)
      • Distributed RT Hybrid Testing (03/17)
      • Pictures from William Allen HS Field Trip (03/08)
      • Student Field Trip this Friday (02/22)
      • Testing on passive damping systems (02/18)
      • NEES equipment maintenance (01/17)
      • "Megaquake 10.0" History Channel Special … (01/11)
    • ► 2010
      • MR Damper Projects (12/28)
      • SteelDay 2010 (09/24)
      • ATLSS Welcomes the 2010 NEES REU Students (06/01)
    • ► 2009
      • Three ATLSS Center researchers honored by American … (07/08)
      • ATLSS welcomes the 2009 REU Students (05/27)
      • Lehigh Webinar for RTMD users (02/18)
    • ► 2008
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (11/06)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/31)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/28)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/21)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/17)
      • ATLSS involved in Discovery Channel program (09/25)
      • "The Works" highlights ATLSS (08/25)
      • RTMD hosts Launch-IT (07/23)
      • ATLSS Seminar: Overview of Structures for 2008 Oly … (05/28)
      • 2008 NEES REU program begins (05/27)
      • Germantown High students get all shook up on field … (05/14)
      • 3D Model Panel for RDV Update (03/19)
    • ► 2007
      • RTMD Highlights for November, 2007 (11/01)
      • RTMD Highlights for October, 2007 (10/01)
      • RTMD Highlights for September, 2007 (09/01)
      • RTMD Highlights for June, 2007 (06/01)
      • RTMD Highlights for May, 2007 (05/01)
      • RTMD Highlights for February, 2007 (02/01)
    • ► 2006
      • RTMD Highlights for November, 2006 (11/01)
      • RTMD Highlights for July, 2006 (07/01)
      • RTMD Highlights for June, 2006 (06/01)
      • RTMD Highlights for May, 2006 (05/01)
      • RTMD Highlights for April, 2006 (04/01)
      • RTMD Highlights for March, 2006 (03/01)
      • RTMD Highlights for February, 2006 (02/01)
      • RTMD Highlights for January, 2006 (01/01)
    • ► 2005
      • RTMD Highlights for December, 2005 (12/01)
      • RTMD Highlights for November, 2005 (11/01)
      • Hybrid Testing Workshop in San Diego (10/01)
      • E-Defense Workshop (08/01)
      • Self Centering Workshop (06/01)
    • ► 2004
      • NEES@Lehigh begins (10/01)
  •    May  2012 »
    SMTWTFS
     12345
    6789101112
    13141516
    May 16, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    17
    May 17, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    18
    May 18, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    19
    May 19, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    20
    May 20, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    21
    May 21, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    22
    May 22, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    23
    May 23, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    24
    May 24, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    25
    May 25, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    26
    May 26, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    27
    May 27, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    28
    May 28, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    29
    May 29, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    30
    May 30, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

    31
    May 31, 2012
    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Passive Damper Frame Testing Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

    • Kurama Specimen 2 construction

      Starts: 12:00 am

      Ends: 12:00 am, June 5, 2012

      More details

     
  • Equipment Calendar

    [site map] Copyright © 2011 · All Rights Reserved · Lehigh University
    This site is supported by the George E. Brown, Jr. Network for Earthquake Engineering Simulation (NEES) Program of the National Science Foundation under Award Number CMMI-0927178