NEES@Lehigh
  • Home
  • Facility
    • ATLSS Facility
    • Personnel
  • Safety
  • Projects
    • Self-Centering Steel Frame Systems
      • Energy Dissipation Elements
      • Moment Resisting Frame
      • Concentrically-Braced Frame
    • Advanced Damping Systems
    • Elastomeric Structural Damper
      • PBD for Seismic Hazard Mitigation
      • Experimental Investigation
      • Performance-Based Design
    • Real-time Hybrid Testing
    • Diaphragm Seismic Design Methodology
    • MISST
    • Buckling-Restrained Braced Frame
      • Buckling-Restrained Braced Frame Videos
    • MRF System with CFT Columns
  • Resources
    • User’s Guide
    • Live Video
    • Calendar
    • Supported Software
    • RDV
    • Publications
      • 2010
      • 2009
      • 2008
      • 2007
      • 2006
      • 2005
      • 2004
      • 2003
      • 2002
    • Lehigh Data Model
    • Workshops
  • Multimedia
    • Photos
      • William Allen High School Trip
      • Elastomeric Damper Installation
      • MISST Construction
      • SC-CBF Base Detail Study
      • BRBF Construction
      • BRBF Testing
      • BRBF Results
      • Composite MRF System with CFT Column Setup
      • Composite MRF System with CFT Column Results
    • Videos
  • News
  • Contact
  • Links
You are here: Home / Resources / RDV

RDV


RDV (Real-time Data Viewer) provides an interface for viewing real-time, synchronized, streaming data from an equipment site. Lehigh has extended the RDV’s capabilities to add 3D Modeling as a type of panel that can be used. This plug-in allows users to create wireframe-based models of physical and analytical structures using node points and element connections. The defined nodes are connected to channels available in RDV which allows the model to be manipulated by displacement, rotation, strain and force data.

RDV can be found at NEES.org.

The user’s guide for the 3D Model Panel can be found here.

Users interested in the NEES@Lehigh data feed can open a pre-configured RDV client connected to our system below.  Java 1.5 or greater is required.

Run Real-time Data Viewer (RDV) version 2.2

Example RDV with 3D Model Panel

Please enable Javascript to view the video

Editing a model:

(Video pauses after each section instruction, hit play to continue through)

Linking channels:

(Video pauses after each section instruction, hit play to continue through)

  • Categories

    • News and Events (40)
    • Project Spotlight (7)
  • Recent News

    • Advances in Real Time Hybrid Simulation Workshop
    • Upcoming workshop
    • Seismic Hazard Mitigation using Passive Damper Systems
  • Archives

    • ► 2011
      • Advances in Real Time Hybrid Simulation Workshop (08/26)
      • Upcoming workshop (08/16)
      • Seismic Hazard Mitigation using Passive Damper Sys … (03/21)
      • Distributed RT Hybrid Testing (03/17)
      • Pictures from William Allen HS Field Trip (03/08)
      • Student Field Trip this Friday (02/22)
      • Testing on passive damping systems (02/18)
      • NEES equipment maintenance (01/17)
      • "Megaquake 10.0" History Channel Special … (01/11)
    • ► 2010
      • MR Damper Projects (12/28)
      • SteelDay 2010 (09/24)
      • ATLSS Welcomes the 2010 NEES REU Students (06/01)
    • ► 2009
      • Three ATLSS Center researchers honored by American … (07/08)
      • ATLSS welcomes the 2009 REU Students (05/27)
      • Lehigh Webinar for RTMD users (02/18)
    • ► 2008
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (11/06)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/31)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/28)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/21)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/17)
      • ATLSS involved in Discovery Channel program (09/25)
      • "The Works" highlights ATLSS (08/25)
      • RTMD hosts Launch-IT (07/23)
      • ATLSS Seminar: Overview of Structures for 2008 Oly … (05/28)
      • 2008 NEES REU program begins (05/27)
      • Germantown High students get all shook up on field … (05/14)
      • 3D Model Panel for RDV Update (03/19)
    • ► 2007
      • RTMD Highlights for November, 2007 (11/01)
      • RTMD Highlights for October, 2007 (10/01)
      • RTMD Highlights for September, 2007 (09/01)
      • RTMD Highlights for June, 2007 (06/01)
      • RTMD Highlights for May, 2007 (05/01)
      • RTMD Highlights for February, 2007 (02/01)
    • ► 2006
      • RTMD Highlights for November, 2006 (11/01)
      • RTMD Highlights for July, 2006 (07/01)
      • RTMD Highlights for June, 2006 (06/01)
      • RTMD Highlights for May, 2006 (05/01)
      • RTMD Highlights for April, 2006 (04/01)
      • RTMD Highlights for March, 2006 (03/01)
      • RTMD Highlights for February, 2006 (02/01)
      • RTMD Highlights for January, 2006 (01/01)
    • ► 2005
      • RTMD Highlights for December, 2005 (12/01)
      • RTMD Highlights for November, 2005 (11/01)
      • Hybrid Testing Workshop in San Diego (10/01)
      • E-Defense Workshop (08/01)
      • Self Centering Workshop (06/01)
    • ► 2004
      • NEES@Lehigh begins (10/01)
  •    February  2012 »
    SMTWTFS
     1234
    567891011
    1213
    February 13, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    14
    February 14, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    15
    February 15, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    16
    February 16, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    17
    February 17, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    18
    February 18, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    19
    February 19, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    20
    February 20, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    21
    February 21, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    22
    February 22, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    23
    February 23, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    24
    February 24, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    25
    February 25, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    26
    February 26, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    27
    February 27, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    28
    February 28, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    29
    February 29, 2012
    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

     
  • Equipment Calendar

    [site map] Copyright © 2011 · All Rights Reserved · Lehigh University
    This site is supported by the George E. Brown, Jr. Network for Earthquake Engineering Simulation (NEES) Program of the National Science Foundation under Award Number CMMI-0927178