NEES@Lehigh
  • Home
  • Facility
    • ATLSS Facility
    • Personnel
  • Safety
  • Projects
    • Self-Centering Steel Frame Systems
      • Energy Dissipation Elements
      • Moment Resisting Frame
      • Concentrically-Braced Frame
    • Advanced Damping Systems
    • Elastomeric Structural Damper
      • PBD for Seismic Hazard Mitigation
      • Experimental Investigation
      • Performance-Based Design
    • Real-time Hybrid Testing
    • Diaphragm Seismic Design Methodology
    • MISST
    • Buckling-Restrained Braced Frame
      • Buckling-Restrained Braced Frame Videos
    • MRF System with CFT Columns
  • Resources
    • User’s Guide
    • Live Video
    • Calendar
    • Supported Software
    • RDV
    • Publications
      • 2010
      • 2009
      • 2008
      • 2007
      • 2006
      • 2005
      • 2004
      • 2003
      • 2002
    • Lehigh Data Model
    • Workshops
  • Multimedia
    • Photos
      • William Allen High School Trip
      • Elastomeric Damper Installation
      • MISST Construction
      • SC-CBF Base Detail Study
      • BRBF Construction
      • BRBF Testing
      • BRBF Results
      • Composite MRF System with CFT Column Setup
      • Composite MRF System with CFT Column Results
    • Videos
  • News
  • Contact
  • Links
You are here: Home / Resources / Workshops

Advances in Real-Time Hybrid Simulation


We are pleased to announce a two-day workshop on Advances in Real-Time Hybrid Simulation workshop to be held October 10-11, 2011, at the Lehigh University Network for Earthquake Engineering Simulation (NEES) RTMD facility.

The objectives of the Advances in Real-Time Hybrid Simulation workshop are:

  • To disseminate information on recent multi-site real-time hybrid simulation testing conducted in the NEES
  • Disseminate other recent advances in real-time hybrid simulation for civil structures
  • Facilitate collaboration of researchers, ideas and facilities among participants.

Students, researchers, and practitioners interested in learning more about exciting recent advances in real-time hybrid simulation are encouraged to attend the workshop. Presentations are sought on advances in real-time hybrid simulation.

Registration is free, lunch is provided. Registration is now closed. 

Please view the complete Agenda of the Workshop from here.

Travel support is available with priority given to early career faculty and those participants presenting. To be eligible for travel support, register before September 12.

This workshop is made possible with funding from NSF (under CMMI 1027779 NEESR-SD: Development of a Real-Time Multi-Site Hybrid Testing Tool for NEES), the University of Connecticut School of Engineering, and NEES at Lehigh.

Richard Christenson
Associate Professor
UTC Professor in Engineering Innovation
Director, Research Program Development
Department of Civil & Environmental Engineering
University of Connecticut

We are providing a WebEx stream of the workshop presentations only.  Please register below for each day.

Topic: Advances in Real Time Hybrid Simulation Workshop Day 1 
Date: Monday, October 10, 2011
Time: 8:45 am, Eastern Daylight Time (New York, GMT-04:00)
—————————————————–
To register for this meeting
—————————————————–
Go to https://neesmeetings.webex.com/neesmeetings/j.php?ED=162198437&RG=1&UID=1217645787&RT=MiMxMQ%3D%3D 
Topic: Advances in Real Time Hybrid Simulation Workshop Day 2 
Date: Tuesday, October 11, 2011
Time: 9:00 am, Eastern Daylight Time (New York, GMT-04:00)
—————————————————–
To register for this meeting
—————————————————–
1. Go to https://neesmeetings.webex.com/neesmeetings/j.php?ED=162198752&RG=1&UID=1217645042&RT=MiMxMQ%3D%3D 
  • Categories

    • News and Events (40)
    • Project Spotlight (7)
  • Recent News

    • Advances in Real Time Hybrid Simulation Workshop
    • Upcoming workshop
    • Seismic Hazard Mitigation using Passive Damper Systems
  • Archives

    • ► 2011
      • Advances in Real Time Hybrid Simulation Workshop (08/26)
      • Upcoming workshop (08/16)
      • Seismic Hazard Mitigation using Passive Damper Sys … (03/21)
      • Distributed RT Hybrid Testing (03/17)
      • Pictures from William Allen HS Field Trip (03/08)
      • Student Field Trip this Friday (02/22)
      • Testing on passive damping systems (02/18)
      • NEES equipment maintenance (01/17)
      • "Megaquake 10.0" History Channel Special … (01/11)
    • ► 2010
      • MR Damper Projects (12/28)
      • SteelDay 2010 (09/24)
      • ATLSS Welcomes the 2010 NEES REU Students (06/01)
    • ► 2009
      • Three ATLSS Center researchers honored by American … (07/08)
      • ATLSS welcomes the 2009 REU Students (05/27)
      • Lehigh Webinar for RTMD users (02/18)
    • ► 2008
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (11/06)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/31)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/28)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/21)
      • NEESR-SG: Self-Centering Damage-Free Seismic-Resis … (10/17)
      • ATLSS involved in Discovery Channel program (09/25)
      • "The Works" highlights ATLSS (08/25)
      • RTMD hosts Launch-IT (07/23)
      • ATLSS Seminar: Overview of Structures for 2008 Oly … (05/28)
      • 2008 NEES REU program begins (05/27)
      • Germantown High students get all shook up on field … (05/14)
      • 3D Model Panel for RDV Update (03/19)
    • ► 2007
      • RTMD Highlights for November, 2007 (11/01)
      • RTMD Highlights for October, 2007 (10/01)
      • RTMD Highlights for September, 2007 (09/01)
      • RTMD Highlights for June, 2007 (06/01)
      • RTMD Highlights for May, 2007 (05/01)
      • RTMD Highlights for February, 2007 (02/01)
    • ► 2006
      • RTMD Highlights for November, 2006 (11/01)
      • RTMD Highlights for July, 2006 (07/01)
      • RTMD Highlights for June, 2006 (06/01)
      • RTMD Highlights for May, 2006 (05/01)
      • RTMD Highlights for April, 2006 (04/01)
      • RTMD Highlights for March, 2006 (03/01)
      • RTMD Highlights for February, 2006 (02/01)
      • RTMD Highlights for January, 2006 (01/01)
    • ► 2005
      • RTMD Highlights for December, 2005 (12/01)
      • RTMD Highlights for November, 2005 (11/01)
      • Hybrid Testing Workshop in San Diego (10/01)
      • E-Defense Workshop (08/01)
      • Self Centering Workshop (06/01)
    • ► 2004
      • NEES@Lehigh begins (10/01)
  •    February  2012 »
    SMTWTFS
     1234
    567891011
    1213
    February 13, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    14
    February 14, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    15
    February 15, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    16
    February 16, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    17
    February 17, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    18
    February 18, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    19
    February 19, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    20
    February 20, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    21
    February 21, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    22
    February 22, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    23
    February 23, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    24
    February 24, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    25
    February 25, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    26
    February 26, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    27
    February 27, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    28
    February 28, 2012
    • RTHT MR damper Frame Dyke, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, February 29, 2012

      Description: Actuators 1, 4, 3

      More details

    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    29
    February 29, 2012
    • Kurama Specimen 1 Test

      Starts: 12:00 am

      Ends: 12:00 am, March 31, 2012

      More details

    • Fleishmann - Naito IFL Anchorage Systems Test Set Up Construction

      Starts: 8:00 am

      Ends: 9:00 am, June 1, 2012

      More details

    • Frame Testing Passive Damper Sause, Ricles

      Starts: 12:00 am

      Ends: 12:00 am, September 1, 2012

      More details

     
  • Equipment Calendar

    [site map] Copyright © 2011 · All Rights Reserved · Lehigh University
    This site is supported by the George E. Brown, Jr. Network for Earthquake Engineering Simulation (NEES) Program of the National Science Foundation under Award Number CMMI-0927178