[edit] Rate Schedule for RTMD Facility, ATLSS, and Fritz Labs - NEES Projects

Tables 7.2-# apply to rates associated with NEES projects only (non-NEES projects are referred to Tables 7.3-# for applicable costs). NEES projects are defined as projects receiving funding through the NSF for use of the NEES equipment or projects that have received approval by NEESinc for shared-use access, as per the NEESinc Shared-Use Partnering Policy.

Note: All costs in subsequent tables are direct cost only (personnel costs also include employee benefits as noted in Table 7.2-3). All costs will be subject to Lehigh University's current indirect cost rate. Contact RTMD Site Operations Manager for university's current indirect cost rate.

Table 7.2-1
ANNUAL PROJECT FEE
Based on total test program budget (including indirect cost) for portion and time frame of research program that utilizes Lehigh University's ATLSS Laboratory
Calculated by multiplying the total test program budget (attributed to activity within ATLSS Laboratory) * annual project fee percentage / 12 (for the number of months in one year) * the number of months utilizing the ATLSS Laboratory
Example: Total budget for NEESR to utilize Lehigh's ATLSS laboratory = $50,000 and projects 3 months utilization of laboratory
Project Fee = $50,000 * 1 % annual project fee / 12 months in year * 3 months in lab = $500/12*3 = $125
Unit of Measure Academic/ Sponsored External Testing & Use
Annual Project Fee Per project 1 % 2 %
Table 7.2-2
FLOOR and WALL SPACE - ATLSS Laboratory
Floor Space
Description Unit of Measure Academic/ Sponsored External Testing & Use
Floor Space < 500 sq ft Per day $0 $50
Floor Space to 1000 sq ft Per day $50 $100
Floor Space to 1500 sq ft Per day $100 $200
Floor Space to 2000 sq ft Per day $150 $300
Floor Space to 2500 sq ft Per day $200 $400
Floor Space to 3000 sq ft Per day $250 $500
Floor Space to 3500 sq ft Per day $300 $600
Floor Space to 4000 sq ft Per day $400 $800
Wall Space
Calculated by multiplying applicable floor space daily rate by wall space occupancy/ blockage factor (provided below)
Example: Assume an academic/sponsored project will utilize 750 sq ft of floor space and 35 sq ft of wall space for 10 working days
Calculation: $50 per day * 10 days * 1.6 = $800
Description Unit of Measure Academic/ Sponsored
(Wall space occupancy/ blockage factor)
External Testing & Use
(Wall space occupancy/ blockage factor)
Wall space < 30 sq ft ----- 1.0 1.0
Wall space to 30 sq ft ----- 1.3 1.3
Wall space to 40 sq ft ----- 1.6 1.6
Wall space to 50 sq ft ----- 2.0 2.0
Table 7.2-3
PERSONNEL - Labor
ATLSS Staff (includes employee benefits, does not include indirect cost)
Personnel Unit of Measure Service/Activity covered under NEES O&M (per Section 7.1) Service/Activity not covered under NEES O&M (per Section 7.1)
ATLSS Laboratory Manager Per hour $0 $80
Laboratory Foreman Per hour $0 $44
Laboratory Technicians Per hour $0 $34
Instrumentation Leader Per hour $0 $48
Instrumentation Technicians Per hour $0 $43
ATLSS IT Manager Per hour $0 $50
Administrative Assistant Per hour $0 $30
NEES Staff (includes employee benefits, does not include indirect cost)
Personnel Units Service/Activity covered under NEES O&M (per Section 7.1) Service/Activity not covered under NEES O&M (per Section 7.1)
NEES Operations Manager Per hour $0 $61
IT Systems Administrator Per hour $0 $43
Software Developer Per hour $0 $43
Project Scientist Per hour $0 $61
Website Developer Per hour $0 $43
Table 7.2-4
NEES EQUIPMENT/NEES INSTRUMENTATION
NEES Equipment
Description Unit of Measure Academic/ Sponsored External Testing & Use
NEES Hydraulic System (NEES actuators) Setup project per year $0 $0
- Static per actuator Per day $0 $0
- Dynamic per actuator Per day $0 $0
- Fatigue to 5M per actuator Per M cycles $0 $0
- Fatigue 5M-50M per actuator Per M cycles $0 $0
- Fatigue >50M per actuator Per M cycles $0 $0
NEES Accumulator System Setup per project per year $0 $0
- Accumulator discharge Per discharge $0 $0
NEES Control System (Pulsar) Setup per project $0 $0
Note: Equipment subject to weekly and monthly rates (as opposed to the per day rate noted above) if the following criteria are met:
- Weekly rate (>2 days/calendar week) 2.5*day rate 2.5*day rate
- Monthly rate (>2 weeks/calendar month) 2.5*week rate 2.5*week rate
NEES Instrumentation
(Charges per instrument, regardless of quantity)
Description Unit of Measure Academic/ Sponsored External Testing & Use
NEES Data Acquisition System (Pacific Instruments) Per day $0 $0
NEES Accelerometers (monoaxial) Per day $0 $0
NEES Accelerometers (triaxial) Per day $0 $0
NEES Temposonics Per day $0 $0
NEES LVDTs Per day $0 $0
NEES Inclinometers Per day $0 $0
NEES Differential Pressure Transducers Per day $0 $0
Camera Setup per camera per project $0 $0
- Axis 2401 fixed network Per test day $0 $0
- Axis 205 fixed network Per test day $0 $0
- Sony SNC-RZ30N portable network Per test day $0 $0
Agilent Power Supply Per instrument $0 $0
Agilent Volt Meter Per instrument $0 $0
Note: Instrumentation subject to weekly and monthly rates (as opposed to the per day rate noted above) if the following criteria are met:
- Weekly rate (>2 days/calendar week) 2.5*day rate 2.5*day rate
- Monthly rate (>2 weeks/calendar month) 2.5*week rate 2.5*week rate
Table 7.2-4
Non-NEES EQUIPMENT/non-NEES INSTRUMENTATION
ATLSS LABORATORY
Non-NEES Equipment
Description Unit of Measure Academic/ Sponsored External Testing & Use
ATLSS Hydraulic System (non-NEES actuators) Setup per project per year $500 $1000
- Static per actuator Per day $300 $600
- Dynamic per actuator Per day $500 $1000
- Fatigue to 5M per actuator Per M cycles $300 $600
- Fatigue 5M-50M per actuator Per M cycles $200 $400
- Fatigue >50M per actuator Per M cycles $100 $200
Enerpac Pumping System Per day $10 $10
Enerpac Jacks Per day $10 $20
Manlift Per day $75 $150
Note: Equipment subject to weekly and monthly rates (as opposed to the per day rate noted above) if the following criteria are met:
- Weekly rate (>2 days/calendar week) 2.5*day rate 2.5*day rate
- Monthly rate (>2 weeks/calendar month) 2.5*week rate 2.5*week rate
Non-NEES Instrumentation
(Charges dependent on quantity of instrumentation utilized)
Description Unit of Measure Academic/ Sponsored External Testing & Use
Data Acquisition System ----- ----- -----
- To 16 channels Per day $75 $150
- To 32 channels Per day $150 $300
- 33 - 64 channels Per day $200 $400
- 65 - 96 channels Per day $250 $500
- >96 channels Per day $300 $600
- CR9000 data logger Per day $250 $500
- CR5000 data logger Per day $150 $300
- Daytronics Per day $50 $100
Strain gage conditioners Per day ----- -----
- 1 - 8 channels Per day $10 $20
- 9 - 16 channels Per day $20 $40
- 17 - 32 channels Per day $40 $80
- 33 - 64 channels Per day $60 $120
- > 64 channels Per day $80 $160
Strain Indicator Per day $10 $20
Peak Reader Per day $10 $20
Precision Voltmeter Per day $20 $40
Power Supply Per day $10 $20
LVDTs ----- ----- -----
- 1 - 8 Per day $20 $40
- 9 - 16 Per day $30 $60
- 17 - 24 Per day $40 $80
- 25 - 32 Per day $50 $100
- 33 - 40 Per day $60 $120
- 41 - 48 Per day $70 $140
- 49 - 56 Per day $80 $160
- 57 - 64 Per day $90 $180
- > 64 Per day $100 $200
Plastic slides ----- ----- -----
- 1 - 8 Per day $10 $20
- 9 - 16 Per day $20 $40
- > 16 Per day $30 $60
String pots ----- ----- -----
- 1 - 4 Per day $20 $40
- 5 - 8 Per day $30 $60
- 9 - 12 Per day $40 $80
- > 12 Per day $50 $100
Rotation meters ----- ----- -----
- 1 - 8 Per day $20 $40
- 9 - 16 Per day $30 $60
- > 16 Per day $40 $80
Load cell Per day $20 $40
Calibration stand Per day $15 $30
Videocam Per day $10 $20
Note: Instrumentation subject to weekly and monthly rates (as opposed to the per day rate noted above) if the following criteria are met:
- Weekly rate (>2 days/calendar week) 2.5*day rate 2.5*day rate
- Monthly rate (>2 weeks/calendar month) 2.5*week rate 2.5*week rate
FRITZ LABORATORY
Non-NEES Equipment
Amsler Hydraulic System Setup per project per year $250 $500
- Static per actuator Per day $150 $300
- Fatigue to 5M per actuator Per M cycles $150 $300
- Fatigue 5M-50M per actuator Per M cycles $100 $200
- Fatigue >50M per actuator Per M cycles $50 $100
MTS/Vickers Hydraulic Setup per project per year $500 $1000
- Static per actuator Per day $300 $600
- Fatigue to 5M per actuator Per M cycles $300 $600
- Fatigue 5M-50M per actuator Per M cycles $200 $400
- Fatigue >50M per actuator Per M cycles $100 $200
Amsler Alternating Stress Machine Per M cycles $150 $300
Baldwin 5000 kip Universal Per day $500 $1000
Baldwin 5000 kip Universal Overnight $200 $400
Riehle 800 kip Universal Per day $300 $600
Southwark Emery 300 kip Universal Per day $150 $300
Note: Equipment subject to weekly and monthly rates (as opposed to the per day rate noted above) if the following criteria are met:
- Weekly rate (>2 days/calendar week) 2.5*day rate 2.5*day rate
- Monthly rate (>2 weeks/calendar month) 2.5*week rate 2.5*week rate
Table 7.2-6
ADDITIONAL LABORATORIES/SERVICES/EQUIPMENT
ATLSS LABORATORY
Description Unit of Measure Academic/ Sponsored External Testing & Use
ATLSS Bracing Frame Per project $15,000 $15,000
Materials Testing ----- ----- -----
- Welding equipment Per hour $5 $10
- Heat treating furnace Per hour $10 $20
Mechanical Testing ----- ----- -----
- 2670 kN (600 kip) Universal Per day $200 $400
- 267 kN (60 kip) Universal Per day $50 $100
245 kN Servo ----- ----- -----
- Static Per hour $10 $15
- < 5 M cycles Per M cycles $50 $75
- 5 - 50 M cycles Per M cycles $25 $35
- > 50 M cycles Per M cycles $10 $15
Charpy V-notch Test Machine Per day $50 $100
Metallography Laboratory ----- ----- -----
- Sample preparation Per sample $5 $10
- Hardness: Rockwell and Vickers Per hour $10 $15
- Optical microscope Per hour $10 $15

Additional Notes:

  1. The 22,242 kN testing machine at Fritz Laboratory is also available for use by NEES researchers. Costs will be developed on a per test basis, based on the complexity of the test setup. The ATLSS Laboratory Manager will assist in developing estimates for the use of this machine.
  2. A 4.0 % annual inflation rate will be applied to all fees for tests that are in place for more than one year.
  3. All costs require indirect cost to be applied to the stated rates (stated rates are only direct cost, with the exception of personnel which also includes employee benefits). Contact the RTMD site operations manager for current Lehigh University indirect cost rates.
  4. Space rates (both floor and wall) are applicable for total elapsed time associated with a given project. Such rates are not subject to the special weekly and monthly rates noted above for select equipment and instrumentation.